GABRIEL KERAMIK AB
ROUND • 19
1
2
3
45°
45°
30
31
32
Assembly - tiles
Level and mark the centre line from
the top down to the base. (Devide
the firebox into two equal halves).
Fix the first tile exactly in the centre
of the marking as shown. Apply
as much adhesive to fix the tile
approx. 5 mm from the stove body.
Level vertically and horizontally.
Place a tile list temporarily (use a
match or similar as joint) and level
it with the firebox block.