GABRIEL KERAMIK AB
ROUND • 15
23
24
13
12
25
13
12
23
24
25
Set the divider block (12) and the
flame protection block (13) with
mortar.
Level vertically and horizontally.
The divider block (12) and flame
protection block (13) must be
2-4 mm below the outer block to
allow the inner body to expand.
Smear a small string of mortar
on top of the divider block and
the flame protection block. Fix
the insulation in the mortar string.
The insulation creates an expan-
sion gap aginst the divider block,
allowing the inner core to move
vertically.
Set the divider block (12) and the
flame protection block (13) with
mortar.
Level vertically and horizontally.
Assembly