![Future Automation EAD3 Installation Instructions Manual Download Page 9](http://html1.mh-extra.com/html/future-automation/ead3/ead3_installation-instructions-manual_2351971009.webp)
Page 9 of 17 // Installation Instructions - EAD3
Installation Instructions
3 - Screen Mounting
1. Lay your screen face down on a padded surface and place the Screen Uprights (1.4 - removed in Step 2)onto
your screens four VESA mount holes. Secure using the bolts and washers provided in the Fixings Pack as
shown below. If your screen has recessed mount holes or if you need to space the uprights off for clearance,
use the spacers provided in the Fixings Pack. The standard mount configuration is VESA400 compatible, to
achieve VESA600 or wider, you will need to swap the left and right Mount Uprights (1.4) over.
2. On the back of each Mount Upright (1.4) will be three Mount Bobbins. Once the uprights are attached to
the back of the screen, measure the horizontal distance between the these Bobbins and adjust the Main
Uprights (1.8 - still attached to the EAD3) so the keyholes fixings on these are the same horizontal distance
apart as the Mount bobbins.
3. Lift and hook the Screen onto the EAD3. The Mount Bobbins should locate into the keyholes on the Main
Uprights (1.8) to secure the screen to the bracket.
1./2.
3.
Measure distance between
Mount Bobbins and set
spacing of Main Uprights
on mechanism accordingly.
Switch plates over for
VESA 600 and above.
Mount Bobbin
Spacing
1.4
1.8