![Future Automation EAD3 Installation Instructions Manual Download Page 6](http://html1.mh-extra.com/html/future-automation/ead3/ead3_installation-instructions-manual_2351971006.webp)
Page 6 of 17 // Installation Instructions - EAD3
Quick-start Guide
Some Future Automation mechanisms may ship with the control box disconnected to prevent damage during
transit. In order to operate the mechanism, the control box will need to reconnected, then have mains power
applied along with the desired control method.
Reconnecting The Control Box
To reconnect the mechanism control box, follow the below steps:
1. Make sure the power is disconnected from the control box.
2. Remove the retaining screw and washer from the end of the control box to allow removal of the control box
lid. (Image 1 Below).
3. Slide off the control box lid to reveal the control board inside.
4. Locate the green connector on the end of the loom leading from the lift mechanism. This plug will have a
small tag attached stating the correct connecting socket on the control board (e.g. “AC1”, “DC2”...) (Image 2
Below).
5. Plug the green connector into the corresponding socket on the control board. This plug is handed and will
only connect correctly one way. Do NOT force the connector into the socket, this can cause serious damage
to the control board and mechanism.
6. Route the wiring loom out of the end of the control box by inserting the black plastic inserts into the slots
provided. (Image 3 Below).
7. Slide the control box cover back over the control board and replace the fi xing screw and washer.
IMPORTANT
For the mechanism to operate, the green three way safety connector with the loop of wire
attached, must also be plugged into the end of the control box. (Image 4 above). If this
connector is not plugged in, a bright red LED will be visible inside control board and the Input
Confi rmation Input LED will be permanently illuminated.
Image 1.
Image 3.
Image 2.
Image 4.
Mechanism Quick-start Guide