Page 12 of 17 // Installation Instructions - EAD3
Installation Instructions
6 - Cable Management
1. The mechanism's control box will be supplied with a 2.5m [8 ' 2"] flying lead.
This control box will need to
be placed in an easily accessible location for future maintenance.
2. Both screen cables and mechanism cables should ideally enter/exit the mechanism through the cable cut
cut-out in the center of the Wall Plate (1.1).
3. After entering from the Cable Cut out in the Wall Plate (1.1), cables should be routed along the underside
of the Upper Arms (following the dotted line below) and fixed using cable ties secured to the tie blocks
supplied.
250
150
100
CL
SYM
All Cables must be correctly managed and secured as shown below to prevent any risk of snagging or
trapping during the mechanisms normal travel.
1.1