1. MOUNTING
1-5
3. Wrap the sheath end with vinyl tape to pass the cable through the main shaft, and
then remove sheath of transducer cable at the length of “main shaft
70 mm.”
Transducer cable
4. After screwing the transducer into main shaft, fasten two socket-set screws
(M6
u
10, supplied) to fasten the main shaft to the transducer.
Note:
The transducer should be screwed into the main shaft by 50 mm.
Installing transducer
Use suitable roller knife to cut sheath.
Main shaft 70 mm
Gasket
When it is difficult to pass the
transducer cables through the
flat washers, gasket and the
cable gland, unbind the
transducer cables and pass
them one by one.
Cable gland
Flat
washer
Grease shaft 50 mm.
Hold this portion
with pipe wrench.
Socket-set screw
M6
×
10, 2 pcs.
Rotate transducer
to screw it into
main shaft.
Summary of Contents for CSH-5LMARK-2
Page 8: ...EQUIPMENT LISTS vi This page is intentionally left blank ...
Page 26: ...1 MOUNTING 1 18 This page is intentionally left blank ...
Page 54: ...3 ADJUSTMENTS 3 8 This page is intentionally left blank ...
Page 60: ...AP 6 ...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ...This page intentionally left blank ...
Page 67: ......
Page 68: ...8 May 2013 H MAKI D 2 ...
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ...D 9 ...
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ...D 18 ...
Page 85: ......
Page 86: ......