Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 36
17. Air Intake Supply Piping Installation Preparation
a) The boiler is equipped with air intake supply and exhaust vent connections located at the
top and rear of the boiler respectively.
b) Air supply is on the top. See Figure 6. For Models PHW300 and PHW500 these
connections are 3" NPT threaded female fittings and for Models ,PHW750, PHW950,
PHW1000, and PHW1400 they are 4" NPT thread female fittings. These fittings will
accept 3" and 4" male/female pipe to tubing adaptors respectively. Model PHW2000 has
6” NPT threaded female fitting.
c) For sealed combustion applications, air intake must be piped out of the building. Air
Intake pipes and fittings for all models shall be Schedule 40 PVC pipe. All Schedule 40
PVC pipe, fittings, primer and cement must conform with American National Standard
Institute and the American Society for Testing and Materials (ANSI/ASTM standards).
d) For applications using make up air from the boiler room, a minimum of 10’ of venting
including the intake muffler must be installed. Per ASME Section VI Para. 6.04, an
unobstructed air ventilation opening should be sized on the basis of one square inch free
area per 2000 BTU/HR maximum fuel input of the combined burners located in the boiler
room. This is subject to state and local regulations. The installation of exhaust fans in a
boiler room is not recommended.
e) All alternative individual venting arrangements must result in an intake pressure drop not
to exceed 2.5” w.c. (Consult factory for assistance.)
f) All common venting arrangements must result in a pressure drop of less than 0.1” w.c.in
the common header. (Consult factory for assistance.)
Figure 6
Summary of Contents for PHW 1000
Page 2: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 2...
Page 6: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 6...
Page 7: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 7 Section 1...
Page 8: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 8...
Page 17: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 17 Section 2...
Page 18: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 18...
Page 42: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 42 Figure 8...
Page 43: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 43 Figure 9 Figure 10 Figure 11...
Page 53: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 53 Section 3...
Page 54: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 54...
Page 71: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 71 Section 4...
Page 72: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 72...
Page 80: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 80...
Page 81: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 81 Section 5...
Page 82: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 82...
Page 90: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 90...
Page 92: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 92...
Page 93: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 93...