Fulton Heating Solutions, Inc. -- PHW Manual -- 2010-0713
Page 21
5. Other Accessories
a) Condensate Drain - one condensate drain kit can
accommodate the condensate from up to eight (8)
Pulse boilers.
b) Spring Mounts - standard spring isolators as well as
seismic spring isolators are available from the
factory. The springs are an alternative to the
elastomer coated fiberglass cubes.
c) Mufflers
6. Locating the Boiler
a) Be sure to familiarize yourself with and consider all connections on the boiler before
starting the installation procedure. Include air supply and exhaust piping (as per
requirements specified on page 33 of this manual), water piping, gas piping, placement of
elastomer cubes/springs, condensate drain, and electrical connections in your review.
Verify that all minimum clearances as per factory requirements in Figure 1 below are
observed, as well as any local codes that pertain to the geographic location where the
boiler is being installed.
Note
The Fulton Pulse Hot Water (PHW) Series boiler is designed for use in closed loop
heating systems. It is not designed for use in systems where water is replenished.
Mineral build up can occur on the heat transfer surfaces and result in equipment
failure.
7. Installing Elastomer Cube Isolation Mounts
(Figure 2a)
a) All pulse combustion boilers must be installed with vibration isolators. No pulse
combustion boiler shall be lagged directly to the concrete floor due to the transfer of
vibration. In the box of trim shipped with each Pulse boiler, Fulton supplies 4 elastomer
cubes used for vibration isolation. For all non-critical installations these 3" x 3" x 2"
cubes must be under each foot of the boiler. Flex connectors must be installed on the gas
Figure 1
Summary of Contents for PHW 1000
Page 2: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 2...
Page 6: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 6...
Page 7: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 7 Section 1...
Page 8: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 8...
Page 17: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 17 Section 2...
Page 18: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 18...
Page 42: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 42 Figure 8...
Page 43: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 43 Figure 9 Figure 10 Figure 11...
Page 53: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 53 Section 3...
Page 54: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 54...
Page 71: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 71 Section 4...
Page 72: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 72...
Page 80: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 80...
Page 81: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 81 Section 5...
Page 82: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 82...
Page 90: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 90...
Page 92: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 92...
Page 93: ...Fulton Heating Solutions Inc PHW Manual 2010 0713 Page 93...