![Fujitsu PRIMERGY Econel 100 Operating Manual Download Page 29](http://html.mh-extra.com/html/fujitsu/primergy-econel-100/primergy-econel-100_operating-manual_121049029.webp)
Econel 100
Operating Manual
29
Hardware Installation
Connecting the Server to the Line Voltage
4.5
Connecting the Server to the Line Voltage
The server is fitted with a built-in power supply.
V
CAUTION!
The server is automatically set to a mains voltage in the range of 100 V
- 240 V. The server may be place in operation only, if the mains voltage
range set on the server corresponds to the local mains voltage.
Figure 3: connecting the Server to the Line Voltage
Ê
Connect the power cord to the server's power supply (1).
Ê
Insert the mains plug into an earthing contact socket (2) in the internal
supply network.
2
1