![Fujitsu PRIMERGY Econel 100 Operating Manual Download Page 17](http://html.mh-extra.com/html/fujitsu/primergy-econel-100/primergy-econel-100_operating-manual_121049017.webp)
Econel 100
Operating Manual
17
Important Notes
Safety
V
CAUTION!
●
Always connect the device and the attached peripherals to the same
power circuit. Otherwise you run the risk of losing data if, for example,
the central processing unit is still running but the peripheral device
(e.g. storage subsystem) has failed during a power outage.
●
Data cables must be adequately shielded.
●
The EN 50173 and EN 50174-1/2 standards apply for LAN cabling. A
minimum requirement is the use of a category 5 screened LAN line
for 10/100 Mbps Ethernet, or a category 5e line for Gigabit Ethernet.
The requirements of the specification ISO/IEC 11801 are to be
considered.
●
When setting up the server, make sure that the tilt guard provided is
mounted properly (tilting risk).
●
Route the cables in such a way that they do not form a potential
hazard (make sure no-one can trip over them) and that they cannot
be damaged. When connecting up a device, refer to the relevant
notes in this manual.
●
Never connect or disconnect data transmission lines during a storm
(lightning hazard).
●
Otherwise you run the risk of losing data if, for example, the central
processing unit is still running but the peripheral device (e.g. storage
subsystem) has failed during a power outage.
●
In emergencies (e.g. damaged casing, controls or cables, penetration
of liquids or foreign matter), switch off the device immediately, remove
the power plug and contact your sales outlet or customer service
team.
●
Proper operation of the system (in accordance with IEC
60950/EN 60950) is only ensured if the casing is completely
assembled and the rear covers for the installation openings have
been put in place (electric shock, cooling, fire protection, interference
suppression).