
202B1263075
2.6 Operating Bending Section ..........................................................40
2.6.1 Operating the Bending Section .......................................40
2.6.2 Angle Lock Function ......................................................42
2.7 Control Valves ..............................................................................44
2.7.1 Suction Valve ..................................................................44
2.7.2 Air/Water Valve ..............................................................44
2.8 Scope Switches for Images and Recording ..................................45
Chapter 3 Preparation and Inspection Before Use ....................................................46
3.1 Preparing Forceps Valve ..............................................................46
3.1.1 Cleaning and Disinfecting (or Sterilizing)
the Forceps Valve ...........................................................47
3.1.2 Inspecting the Forceps Valve ..........................................47
3.1.3 Attaching the Forceps Valve ..........................................47
3.2 Preparing Air/Water Valve and Suction Valve ............................48
3.2.1 Inspecting the Air/Water Valve and Suction Valve........48
3.2.2 Attaching the Air/Water Valve and Suction Valve ........49
3.3 Preparing and Inspecting Over-tube and Balloon ........................50
3.3.1 Preparing and Inspecting Necessary Equipment ............50
3.3.2 Attaching the Over-tube .................................................52
3.3.3 Mounting the Endoscope Balloon ..................................52
3.3.4 Attaching the Fixing Rubber ..........................................54
3.3.5 Attaching the Hood (Only When Necessary) .................57
3.3.6 Inspecting the Balloon ....................................................59
3.4 Connecting Balloon Controller ....................................................60
3.4.1 Connecting the Balloon Controller .................................60
3.4.2 Inspecting the Balloon (Balloon Controller) ..................61
3.5 Preparing System ..........................................................................63
3.5.1 Preparing Peripheral Devices .........................................63
3.5.2 Preparing the System ......................................................63
3.6 Connecting Endoscope (Attachment) ...........................................65
3.6.1 Connecting the Endoscope
(Video Processor and Light Source) ...............................65
3.6.2 Connecting the Water Tank and Suction Unit ................67
3.7 Inspecting Endoscope ...................................................................68
3.7.1 Inspecting the Insertion Portion ......................................68
3.7.2 Inspecting the Bending Mechanism ................................69
3.7.3 Inspecting the Air/Water Supply and
Suction Channels ............................................................69
3.7.4 Inspecting the Balloon Air Feed Inlet .............................71
3.7.5 Inspecting the Instrument Channel .................................71
3.8 Inspecting Distal End of Endoscope ............................................72
8
Contents
EI580BT_E2-10_202B1263075.indb 8
2015/08/12 16:20:29