![FujiClean CE Installation Manual Download Page 38](http://html1.mh-extra.com/html/fujiclean/ce/ce_installation-manual_2342241038.webp)
38
Step 14 continued: Set Rebar
arrangement for top slab.
Pour fresh concrete
Cure concrete until
hardened.
Step 15: Be sure to pitch final grade away from covers to sweep
surface water away from system.
Step 16: Fill out Warranty Activation Card (received with this Installation Manual) and return to
FujiClean USA to activate system Warranty. Warranty activation is also available via
www.fujicleanusa.com
. Please call FujiClean USA for assistance if necessary: 207-406-2927.
Step 14 continued: Reference information access cover for H-20, HS-20
Bolt lock type
Must have holes to move access cover