Step 4: Set tank
Step 5: Fill tank with fresh water to
Low water level mark in all 3
chambers.
Note: Start with center chamber and
alternate chambers while filling for
evenly balanced fill.
Recheck that tank is level to 1/8” per 2
feet (10mm per 2 meter or 1/200), (fore
and aft as well as side to side), as tank
balance might be altered after it is filled
with water.
Water
To ensure tank water tightness, check in 24 hours to be sure that the water level has not dropped.
Contact your distributor or FujiClean USA if water level has dropped.
Use 4-point lifting lugs. Carefully
lower and set tank.
Check that tank is level to 1/8” per 2
feet, (10mm per 2 meter or 1/200),
fore and aft as well as side to side.
Step 3: Set pre-cast concrete or
pour concrete base.
H-20 and HS-20 load installations
require a concrete base.
Bearing power of soil should be
8.7 PSI or more.
Pre-cast concrete base option
Check that concrete is level to 1/8” per 2 feet
(10mm per 2 meter or 1/200),
(fore and aft as well as side to side).