4 - 5
INP-TN4PHAV-E
(3)
Caution on connection of input signal through barrier
A) Thermocouple input and resistance bulb input
Perform "Calibration of measured value" with the input connected to the barrier recorder because
the barrier internal resistance is added and causes an error in the measured value.
For the calibration method, refer to Item 9.4.
B) When using Fuji Zener Barrier (PWZ), a power source 100V AC line (85 to 132V AC) should be
used to ensure safe operation of the unit.
RECORD
LIST
ON
OFF
ON
OFF
ON
OFF
Remote control
Recording starts
(across terminals
(11) to (21))
Chart speed change
(across terminals
(12) to (22))
Data printout
(across terminals
(13) to (23))
Recording
starts
Recording
stops
Recording
starts
While
recording
is stopped
During
recording
List
printout
Remote
mode chart
speed
Normal
operation
chart speed
List
printout
starts
List
printout
starts
Recording
starts
Recording
starts
List
printout
starts
List
printout
starts
List
printout
stops
Front panel switch