6 - 1
INP-TN4PHAV-E
6.1
Before running the equipment:
Check the following points before starting operation.
1.
Recording paper, recording head installation
(1) Loading chart paper ....................................................... See Section 5.1
(2) Installation of recording head ........................................ See Section 5.2
2.
Wiring
(1) Input terminals .............................................................. See Section 4.2
(2) Alarm terminals (option) ............................................... See Section 4.2
(3) Power supply, ground terminals .................................... See Section 4.2
3.
Do the input types and channels match?
(1) Type specification ......................................................... See Section 1.3
(2) Changing the type of input terminals ............................ See Section 5.3
6. OPERATION AND ACTIONS