3
Fit ferrules to phase conductors and the ground conductor of the mains
cable; crimp ferrules with pliers
CAUTION!
Risk of short circuits!
If ferrules are not used, there is a risk of short circuits between the phase
conductors or between phase conductors and the ground conductor.
▶
Fit ferrules to all phase conductors and the ground conductor of the
stripped mains cable.
4
Undo the screws (2 x) and clamping
nut (size 30) on the strain-relief
device
PE
W
1
V1
U1
5
7
8
6
5
Insert the mains cable into the
strain-relief device
NOTE!
Push the mains cable in far enough to
make it possible to connect the
ground conductor and the phase con-
ductors to the block terminal prop-
erly.
6
Tighten the clamping nut (size 30
mm)
7
Tighten the screws (2 x)
8
Connect the mains cable to the
block terminal correctly:
-
Ground conductor (green, or
green with yellow stripes) to
the PE connection
-
Phase conductors to connec-
tions L1 - L3
9
Re-fit the left side panel of the
power source
51
EN
Summary of Contents for TransTig 1700
Page 2: ......
Page 19: ...General information 19...
Page 20: ...20...
Page 25: ...Control elements and connections 25...
Page 26: ...26...
Page 45: ...Installation and commissioning 45...
Page 46: ...46...
Page 55: ...Welding 55...
Page 56: ...56...
Page 72: ...72...
Page 73: ...Setup settings 73...
Page 74: ...74...
Page 87: ...Troubleshooting and maintenance 87...
Page 88: ...88...
Page 96: ...96...
Page 97: ...Appendix 97...
Page 98: ...98...
Page 124: ......