
60 %
30 %
0 %
0,95
0,90
0,85
(1)
(2)
V+
IO2
IO3
IO4
/RG0
IN7
/2/6
IN8
/3/7
IN9
/4/8
(4)
IO0
GND
(3)
IO4/RG0
V+ V+ IO0 IO2
IN6/1/5 IN8/3/7 IN10
IN1
1
IN9/4/8
IN7/2/6
IO5/CL0
IO3
IO1
GND
GND
(1)
Ripple control signal receiver with 3 relays, for effective power limiting.
(2)
Ripple control signal receiver with 3 relays, for power factor limiting.
(3)
I/Os of the data communication area.
(4)
Load (e.g. signal lamp, signal relay).
DNO Editor settings:
Appro
ved
Input pattern
Effective
power
Power factor cos
φ;
DNO output
Excluded
inverter
*
(1)
(2)
... not usable
... not considered
etc. contact open
etc. contact closed
Autotest
(CEI 0-21)
Description
The 'Autotest' can be used to check the protective function required by the Italian stand-
ard for monitoring the voltage and frequency limits as well as the trip limits of the inverter
during commissioning. During normal operation, the inverter constantly checks the cur-
rent voltage and frequency actual value of the grid.
After the start of the autotest, various individual tests run automatically one after the
other. Depending on grid conditions, the duration of the test is approx. 15 minutes.
IMPORTANT!
The inverter may only be commissioned in Italy after a successful autotest (CEI 0-21). If
the autotest is not passed, no feed-in operation may take place. If the autotest is started
102
Summary of Contents for Symo GEN24 10.0
Page 2: ......
Page 10: ...10 ...
Page 11: ...General information 11 ...
Page 12: ...12 ...
Page 28: ...28 ...
Page 29: ...Backup power variant PV Point OP 29 ...
Page 30: ...30 ...
Page 32: ...32 ...
Page 33: ...Backup power variant Full Backup 33 ...
Page 34: ...34 ...
Page 41: ...Installation 41 ...
Page 42: ...42 ...
Page 82: ...82 ...
Page 83: ...Settings web interface of the inverter 83 ...
Page 84: ...84 ...
Page 104: ...104 ...
Page 105: ...Appendix 105 ...
Page 106: ...106 ...
Page 116: ...116 ...
Page 117: ...Circuit diagrams 117 ...