![Fronius Calibration system 2.0 Operating Instructions Manual Download Page 85](http://html1.mh-extra.com/html/fronius/calibration-system-2-0/calibration-system-2-0_operating-instructions-manual_2339341085.webp)
1
1
1
Connect the gas hose to the pres-
sure regulator and to the Gas IN
connection on the calibration sys-
tem
max. supply pressure: 5 bar
2
2
2
Connect the gas hose to the
wirefeeder or the power source
and to the Gas OUT connection on
the calibration system
3
3
3
Connect the gas and data connec-
tions to each other
Calibrating
WeldCube Con-
nector
IMPORTANT!
Before starting the calibration process:
-
All devices to be calibrated must be connected to the calibration system:
power source, wirefeeder, shielding gas supply; etc.
-
The power source to be calibrated must be switched on at least 5 minutes
before the calibration process starts.
The calibration process is started from the calibration software on the com-
puter / laptop.
85
EN
Summary of Contents for Calibration system 2.0
Page 2: ......
Page 13: ...General information 13...
Page 14: ...14...
Page 22: ...22...
Page 23: ...Controls connections and mechan ical components 23...
Page 24: ...24...
Page 28: ...28...
Page 29: ...Installation 29...
Page 30: ...30...
Page 38: ...38...
Page 39: ...Calibrating welding systems 39...
Page 40: ...40...
Page 47: ...2 2 Connect the Signotec signature pad to the calibration system 47 EN...
Page 90: ...90...
Page 91: ...Troubleshooting 91...
Page 92: ...92...
Page 95: ...Technical data 95...
Page 96: ...96...
Page 99: ...99 EN...