![Fronius Calibration system 2.0 Operating Instructions Manual Download Page 78](http://html1.mh-extra.com/html/fronius/calibration-system-2-0/calibration-system-2-0_operating-instructions-manual_2339341078.webp)
44
After about 3 seconds of wirefeeder running time, click on "Start measuring
process" in the calibration program and release the torch trigger
45
Enter the value displayed on the power source under "Display" and click on
[Next >]
46
Repeat steps 43 - 45 for the measurement of M2 to M5 and M1
When the calibration process is complete, a notification is displayed to this
effect and the [Print calibration report] button is available.
47
Click [Print calibration report]
Calibration system / create report
is displayed.
48
Enter the details to create the calibration report:
Under Template, select the language for the calibration report from the list
Enter the output path
Enter or search for ( [Browse] ) the file name
If the Signotec signature pad is connected and has been detected by the cal-
ibration system, a notification to this effect is displayed under Signature pad.
If not, check the connection of the Signotec signature pad to the calibration
system and then click on [Reconnect].
49
Sign the Signotec signature pad with the corresponding digital pen
50
Press [OK] on the Signotec signature pad
The signature is sent to the calibration software.
x ... Cancel signature
Refresh ... new signature
A corresponding notification is displayed after the signature has been re-
ceived successfully.
51
Click [Create PDF]
IMPORTANT!
Only after the confirmation "PDF created successfully!" is dis-
played, will the calibration report be saved.
Calibrating Tran-
sTig 170 / 210
Requirement:
-
TransTig 170 / 210 firmware version: at least 4.1.7 or higher
-
Start with external ignition aid (EHF) activated:
TIG setup menu - Level 2 / IGn / EHF
After calibration, deactivate EHF again or reset it to the original value.
-
Break voltage UCo set to a value > 30 V:
TIG setup menu - Level 2 / UCo > 30 V (factory setting = 35 V)
IMPORTANT!
Before starting the calibration process:
-
All devices to be calibrated must be connected to the calibration system:
power source, shielding gas supply, etc.
-
The power source to be calibrated must be switched on at least 5 minutes
before the calibration process starts.
78
Summary of Contents for Calibration system 2.0
Page 2: ......
Page 13: ...General information 13...
Page 14: ...14...
Page 22: ...22...
Page 23: ...Controls connections and mechan ical components 23...
Page 24: ...24...
Page 28: ...28...
Page 29: ...Installation 29...
Page 30: ...30...
Page 38: ...38...
Page 39: ...Calibrating welding systems 39...
Page 40: ...40...
Page 47: ...2 2 Connect the Signotec signature pad to the calibration system 47 EN...
Page 90: ...90...
Page 91: ...Troubleshooting 91...
Page 92: ...92...
Page 95: ...Technical data 95...
Page 96: ...96...
Page 99: ...99 EN...