5 Start-up
5.1 Before commissioning / configuring the boiler
The boiler must be configured to the heating system on initial start-up.
NOTICE
Optimum efficiency and efficient, low-emission operation can only be guaranteed
if the system is set up by trained professionals and the standard factory settings
are observed.
Take the following precautions:
❒ Initial startup should be carried out with an authorised installer or with Froling
customer services
NOTICE
Foreign bodies in the heating system impair its operational safety and can result
in damage to property.
As a result:
❒ The whole system should be rinsed out before initial start-up in accordance
with EN 14336.
❒ Recommendation: Make sure the hose diameter of the flush nozzles in the
flow and return complies with ÖNORM H 5195 and is the same as the hose
diameter in the heating system, however not more than DN 50.
❒ Turn on the main switch
❒ Set the boiler controller to the system type.
❒ Load the boiler default values.
NOTICE! For the keypad layout and instructions for modifying the parameters, see the
instruction manual for the boiler controller.
❒ Check the system pressure of the heating system.
❒ Check that the heating system is fully vented.
❒ Check that all water connections are tightly sealed
➥ Pay particular attention to those connections from which plugs were removed
during assembly.
❒ Check that the safety devices are present and working efficiently.
❒ Check that there is sufficient ventilation in the boiler room.
❒ Check the seal of the boiler.
➥ All doors and inspection openings must be tightly sealed.
❒ Check that the drives and servo motors are working and turning in the right
direction.
❒ Check that the door contact switch is working efficiently.
NOTICE! Check the digital and analog inputs and outputs - See the instruction manual
for the boiler controller.
5
Start-up
Before commissioning / configuring the boiler
58
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com