4 Assembly
4.1 Materials supplied
The boiler comes on a pallet together with insulation, controller and accessories.
Some of the components come in cardboard packaging.
1
Boiler
8
Cardboard box containing small parts
2
Insulation
9
Pneumatic rods, complete
3
Controller
10
Ash shovel
4
EOS system (heat exchanger
optimisation system)
11
Cleaning kit
5
Flue gas pipe nozzle
12
Cleaning brush, small
6
Ceramic fibre seal
13
Cleaning brush, large
7
Induced draft fan
Not pictured: installation and operating instructions, guarantee certificate, identification
plate
4.1.1 Tools required
The following tools are required for assembly:
❒ Spanner or box wrench set (widths across flats 8 - 32 mm)
❒ Set of Allen keys
❒ Flat head and cross-head screwdrivers
❒ Hammer
❒ Diagonal cutting pliers
❒ Half-round file
❒ Power drill or cordless screwdriver with Torx bit insert
Assembly
4
Materials supplied
Installation Instructions S3 Turbo | M1081217_en
23
All manuals and user guides at all-guides.com