Table of Contents
1
General
4
1.1
About this manual
4
2
Safety
5
2.1
Hazard levels of warnings
5
2.2
Qualification of assembly staff
6
2.3
Personal protective equipment for assembly staff
6
2.4
Design Information
7
2.4.1
Notes on standards
7
General standards for heating systems
7
Standards for structural and safety devices
7
Standards for heating water
7
Regulations and standards for permitted fuels
8
2.4.2
Installation and approval of the heating system
8
2.4.3
General information for installation room (boiler room)
8
2.4.4
Requirements for central heating water
9
2.4.5
Notes for using pressure maintenance systems
11
2.4.6
Return lift
11
2.4.7
Combination with storage tank
12
2.4.8
Chimney connection/chimney system
14
Draught limiter
14
Measuring port
14
Boiler data for planning the flue gas system
15
3
Technology
16
3.1
Dimensions
16
3.2
Components and connections
17
3.3
Technical specifications
18
4
Assembly
23
4.1
Materials supplied
23
4.1.1
Tools required
23
4.2
Positioning
24
4.2.1
Temporary storage
24
4.3
Setting up in the boiler room
25
4.3.1
Remove boiler from pallet
25
4.3.2
Moving the boiler in the boiler room
25
4.3.3
Minimum distances in the boiler room
26
4.4
Before Installation
26
4.4.1
Changing door stops (as needed)
26
Converting the fuel loading door
28
4.4.2
Fitting the door handles
29
4.4.3
Setting and checking the seal on the doors
29
Positioning the doors
31
4.5
Installing the boiler
32
4.5.1
Assembly overview
32
Insulation
32
Air duct system
34
Table of Contents
2
Froeling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.at
All manuals and user guides at all-guides.com