15
D E T A IL 16 - B
D E T A IL 16 - A
A
B
TOP ANGLE (ITEM #5)
CABNET
SILL PLATE TAB
SIDE ANGLE (ITEM #6)
2 REQUIRED
8-A X 3/8" LONG SCREW
(ITEM #7) 2 REQUIRED
TAB
TAB
LOOP
Shell (Cabinet) Preparation for Installation
STEP 1 Remove still plate and bend the taps up and reinstall 4” back from original shipping position. Move shell guides 4” forward (to
the forward-most hole in the shell rail). See (DETAIL 16-A).
STEP 2 Take the side angles (item #6) and engage its loops in the tabs (both sides) of the sill plate. (DETAIL 16-A).
STEP 3 Take the top Flange (item #5) and engage its tabs in the top loops of the side flanges (DETAIL 16-B).
STEP 4 Install two (2) screws (Item #7) to secure the top angle tabs and the side angle in the side of the cabinet (Detail 16-B).
Figure 16
Summary of Contents for Hazardgard SH20M50B
Page 11: ...11 Installation Outdoor Indoor Clearances Figure 8 Figure 9...
Page 18: ...18 Typical Installation Sill Plate cont Figure 21 Figure 22...
Page 41: ...11 Instalaci n espacios interiores y exteriores Figura 8 Figura 9...
Page 48: ...18 Instalaci n t pica placa de alf izar continuaci n Figura 21 Figura 22...
Page 71: ...11 Installation Jeux ext rieurs int rieurs Figure 8 Figure 9...
Page 78: ...18 Installation typique Lisse bas suite Figure 21 Figure 22...