VYPER
™
VARIABLE SPEED DRIVE
INSTALLATION - OPERATION - MAINTENANCE
100-210 IOM (
JUL
09)
Page 8
-- Apply power to the Vyper Drive system.
A: Confirm dipswitches on the Vyper Logic Board are properly set. Refer to the “VSD Logic Board Setup” section of the
S100-200 or S100-210 IOM.
B: Verify no problems exist with the unit power supply connections.
C: Verify no problems exist with the boot-up of the Quantum
™
LX panel and control system.
D: Set the FLA ratings on the Vyper Logic Board as per job site requirements.
E: Set up the Quantum
™
LX panel in accordance with job site requirements. Refer to Refer to Quantum
™
LX Panel Setup in
the Operation portion of the S100-200 or S100-210 IOM.
F: Confirm operation of internal cooling fans.
G: Confirm operation of the coolant pump.
H: Confirm operation of the Vyper motorized coolant temperature control mixing valve.
I: Confirm wiring, operation, and correct rotation of motor blower fans if present.
Pre-startup Inspection
After installation is complete, use the following as guide
to checks items D – I, under in the Applying power to the
Vyper
™
Drive system section, in the preceding Vyper
™
Pre-
Operation Site Checklist. Any changes to factory setpoints,
needs to be approved by Frick
®
. Failure to obtain approval
may void warranty. Read all steps thoroughly and contact
the factory with any questions before proceeding.
1. With power off - In the drive, remove wire 624 (com-
pressor run) on the drive side of control wiring terminal
strip.
2. Remove wire 675 (oil pump run) if the unit is equipped
with an oil pump.
3. Close the drive, turn on the disconnect using the oper-
ating handle on the door.
4. Once the Quantum
™
LX panel has booted go to the level
2 operating session.
5. Confirm communications between the Vyper
™
drive
and the Quantum
™
LX by going to the Vyper
™
screen.
If there are base-plate temperature readings that are
approximate to ambient and a value is displayed for the
JOB FLA communications is confirmed. Compare the
Job FLA value to the panel test report Special Instruc-
tions section to ensure they match. If the JOB FLA is not
listed on the panel test report, use the JOB FLA tables
in this manual to calculate.
6. Go to the motor setpoints screen to check the motor
amps safeties, relative to the motor and drive combina-
tion. If these values are not correct use the tables in this
manual to calculate what they should be.
7. Verify proper operation of the motorized coolant mixing
valve on the back of the drive.
• Locate the Coolant mixing valve on the back of the
drive, remove the cover from the motor and check
that the dip-switches are set as 1 ON, 2 OFF, 3 ON
& 4 OFF. If a change needs to be made, the power
must be cycled at the panel for the change to be in
effect.
• Go to Page 2 of PID setpoints, for the Vyper Coolant
PID. Ensure the setup is per the setup in this manual.
If it is, set the Control as Always and the Direction
as Reverse. Check the indicator disc or arrow on the
shaft between the valve and the actuator motor that
it is operating. Once it has moved to one end of the
stroke, change the Direction back to Forward. This
should move the Indicator Disc or Arrow back to the
other end of the stroke.
• Set the Control back to Running and submit.
8. Using a screw driver at the operating handle on the
door, open the drive leaving the power on, so that the
ride side panel can be opened providing access to the
logic board.
9. Re-secure the left side panel.
10. If the Job FLA setting is not correct this can now be set
using the Job FLA pot on the control logic board. Moni-
tor the value on the Vyper screen of the Quantum
™
LX to
determine when the value is properly set.
11. Test the internal fan and coolant circulation pump op-
eration by removing the P2 plug from the J2 connector
on the control logic board. Removing this plug will start
these devices. You will hear the fans run. The circulation
in the coolant loop should be seen through the clear
hose, proving the circulation pumps operation. Recon-
nect the P2 plug to the J2 connector to turn off these
devices. Doing this test will create a Low Inverter Base-
Plate Temperature shutdown on the Quantum
™
LX that
will need to be cleared.
12. Close the drive completely and with power still on, do a
simulated run of the compressor by pressing the manu-
al start button on the Quantum
™
LX. This should engage
the blower motors on the compressor drive motor to
verify proper rotation and operation of the blower mo-
tors. Rotational arrows on the fan housing shows proper
rotation, correct if necessary by changing any two wires
at the blower motor connection box with power locked
out.
13. Turn power off with the operating handle on the door of
the drive. Open the drive and check to ensure the panel
is de-energized. Carefully replace wires 624 and 675.
Tighten to 12 lb. In.