![FPS PowerSewer V4PS Installation, Operation & Maintenance Manual Download Page 27](http://html1.mh-extra.com/html/fps/powersewer-v4ps/powersewer-v4ps_installation-operation-and-maintenance-manual_2326025027.webp)
27
THREE PHASE, IGPDS MANUAL GRINDER
Wiring Diagram
PUMP OFF
TB3
1
2
3
T1
T2
T3
T1
T2
4
5
6
7
8
9
208/240/480/600 VAC - 3-PHASE - 60 HERTZ POWER SUPPLY
INCOMING POWER
TB2
PUMP ON
ALARM
PANEL GND
BL
UE
OR
ANGE
BR
OWN
RED
RED
/BL
ACK
BL
ACK
CONTROL PANEL
515312, 515313, 515314
208/230/460/575 VAC
PUMP POWER CABLE
GREEN
BL
ACK
WHITE
RED
BL
ACK
WHITE
BL
ACK
BL
ACK
BL
ACK
WHITE
WHITE
WHITE
SENSOR CABLE
3-PHASE
IGPDS-M GRINDER PUMP
PUMP
OFF FLOAT
PUMP
ON FLOAT
HIGH LEVEL
ALARM FLOAT
TANK JUNCTION BOX
MOUNTED IN TANK DRY WELL
12 AWG PUMP CABLE
125 FT MAX
COMMON RUN START
TB4
SEAL FAIL
18 AWG
FLOAT
CABLE
18 AWG
SEAL FAIL
CABLE
NOTE:
This is a control drawing only and does not reflect the actual locations of cable penetrations.
1. Follow National Electric Code NEC/NFPA/ANSI 70 and local regulations when installing all wiring.
2. This system is meant to be used with approved components only.
3. Main power disconnect is to be provided by installer.
4. Torque large field wiring terminals to 35 in-lbs and small field wiring terminals to 12 in-lbs.
5. Field wiring must be 60 °C copper wire minimum.
6. Level switches must be rated a minimum of 2 Amps at 120 V.
Summary of Contents for PowerSewer V4PS
Page 1: ...V4PS Installation Operation Maintenance Manual...
Page 31: ...31 NOTES...