NOTE:
This is a control drawing only and does not reflect the actual locations of cable penetrations.
1. Follow National Electric Code NEC/NFPA/ANSI 70 and local regulations when installing all wiring.
2. This system is meant to be used with approved components only.
3. Main power disconnect is to be provided by installer.
4. Torque large field wiring terminals to 35 in-lbs and small field wiring terminals to 12 in-lbs.
5. Field wiring must be 60 °C copper wire minimum.
6. Level switches must be rated a minimum of 2 Amps at 120 V.
THREE PHASE, IGP/IGPH MANUAL GRINDER
Wiring Diagram
208/240/480/600 VAC - 3-PHASE 60 HERTZ POWER SUPPLY
INCOMING POWER
CONTROL PANEL
515282, 515307, 515284, 515286
TB3
1
2
3
COMMON RUN START
T1
T2
T3
4
5
6
7
8
9
PANEL GRD
BL
UE
BL
ACK
OR
ANGE
BR
OWN
RED
RED
/BL
ACK
12 AWG PUMP CABLE
125 FT MAX
18 AWG
FLOAT
CABLE
208/230/460/575 VAC
PUMP POWER CABLE
3-PHASE
IGP-M/IGPH-M GRINDER PUMP
PUMP
OFF FLOAT
PUMP
ON FLOAT
HIGH LEVEL
ALARM FLOAT
TANK JUNCTION BOX
MOUNTED IN TANK DRY WELL
GREEN
WHITE
RED
BL
ACK
BL
ACK
BL
ACK
BL
ACK
WHITE
WHITE
WHITE
PUMP OFF
TB2
PUMP ON
ALARM