background image

 

 
Part No.21966  Rev. M  February 2016 

- 20 - 

Heated Well GN Series

 

SPECIFICATIONS 

 

Mechanical 

DROP-IN HEATED WELL ASSEMBLIES 

 - 

SPECIFICATIONS 

 
 

 

CABINET MODEL 

 

IN-GNH03 

IN-GNH04 

IN-GNH05 

IN-GNH06 

IN-GNH08 

Height above joinery 

18 mm 

Depth below joinery 

260 mm plus drain tap assembly 

Width 

805 mm 

Length 

1320 mm 

1660 mm 

2000 mm 

2340 mm 

3020 mm 

Dry Weight 

123 kg 

150 kg 

178 kg 

206 kg 

269 kg 

Well Material 

Stainless steel 

Approx. Display Area 

0.45 m

0.6 m

2

 

0.75 m

2

 

0.9 m

2

 

1.2 m

2

 

Glass Type 

Toughened glass is used in the optional overhead gantry 

Top Heat Lamps 

Optional overhead heating/lighting gantry available 

Climatic Class & IP 

All wells are suitable for class N climates and have an IP 22 rating 

 

Electrical 

DROP-IN HEATED WELL ASSEMBLIES 

 - 

SPECIFICATIONS 

 
 

 

CABINET MODEL 

 

IN-GNH03 

IN-GNH04 

IN-GNH05 

IN-GNH06 

IN-GNH08 

Voltage 

230 - 240 V  50 Hz  1

 or 3

 (Star connected) 

Power  

2.5kW 

3.3kW 

4.1kW 

4.9kW 

6.5kW 

Current (1

 operation) 

(excluding gantry) 

10.5A 

13.8A 

17A 

20A 

28A 

Connection 

Terminals 

Heating Elements 

1.6kW  

+800W 

2 x 1.6kW 

2x1.6kW 

+800W 

3 x 1.6kW 

4 x 1.6kW 

Heat Lamps 

300 W linear halogen lamps in optional overhead gantry 

 

Details of individual Phase loads 

 

Cabinet 

Model 

1Ph Current 

Draw, No 

Light Gantry 

1Ph Current 

Draw, With 

Light Gantry 

3Ph+N Current Draw,  

No Light Gantry 

3Ph+N Current Draw, 

With Light Gantry 

IN-GNH03 

10.5A 

14.5A 

L1=0.0A, L2=3.5A, L3=7.0A 

L1=4.0A, L2=3.5A, L3=7.0A 

IN-GNH04 

14.0A 

19.0A 

L1=0.0A, L2=7.0A, L3=7.0A 

L1=5.0A, L2=7.0A, L3=7.0A 

IN-GNH05 

17.5A 

24.0A 

L1=3.5A, L2=7.0A, L3=7.0A 

L1=10.0A, L2=7.0A, L3=7.0A 

IN-GNH06 

21.0A 

29.0A 

L1=7.0A, L2=7.0A, L3=7.0A 

L1=15.0A, L2=7.0A, L3=7.0A 

IN-GNH08 

28.0A 

38.5A 

L1=0.0A, L2=14.0A, L3=14.0A 

L1=10.5A, L2=14.0A, L3=14.0A 

 

 

Summary of Contents for IN-GNH03

Page 1: ...Inline GN Series Heated Well...

Page 2: ...rights reserved No part of this publication may be reproduced stored in a retrieval system or transmitted in any form or by any means electronic mechanical photocopying recording or otherwise without...

Page 3: ...ighting 8 Controls 9 Control Panel 9 Temperature 9 Operating Mode 9 On Off Switch 9 Indicator Lamps 9 Operating Mode 10 Choice of Mode 10 Dry Mode 10 Steam Mode 10 Wet Mode 10 Temperature Settings 11...

Page 4: ...spection 15 Correction 15 INSTALLATION 16 Regulations 16 Compliance with Local Requirements 16 Setting Up 16 Unpacking 16 Site Preparation 16 Well Assembly Preparation 16 Grounding 16 Power Supply 17...

Page 5: ...RICAL CIRCUIT DIAGRAMS 22 Model IN GNH03 22 Model IN GNH03 Auto fill 22 Model IN GNH04 23 Model IN GNH04 Auto fill 23 Model IN GNH05 24 Model IN GNH05 Auto fill 24 Model IN GNH06 25 Model IN GNH06 Aut...

Page 6: ...mendations The time taken will be well spent These instructions both general and technical tell you how to install operate and look after your inline food service cabinet so that you can receive the f...

Page 7: ...ed from warranty Breakage of glass or plastic components or the replacement of lamps fluorescent tubes or gaskets Failure resulting from incorrect assembly after cleaning Fair wear and tear Failure of...

Page 8: ...h sizes Operating Temperature The operating temperature of the well is adjustable using the digital controller There are optimum temperature settings for each of the modes of operation Overflow and Dr...

Page 9: ...temperature setting Release both buttons to store the new temperature setting The display will now revert to showing the actual well temperature Operating Mode Rotate the mode switch to the appropria...

Page 10: ...rom the elements can cause hot spots particularly if deep dishes are used This mode works best if the food in the dishes has a high liquid content to allow heat circulation inside the dish Steam Mode...

Page 11: ...ing for wet mode operation is 75 C Storage and Display Basics DROP IN HEATED WELL ASSEMBLIES OPERATION Food Temperature In general hot food should be kept at 65 C or above The heated well MUST have re...

Page 12: ...perature with dishes in place before adding food The well temperature is indicated on the controller display and the Element On indicator lamp will extinguish when the set temperature is reached To re...

Page 13: ...ter thirty minutes Controller is faulty Have controller replaced An element is blown Have the element replaced Overhead lights not working If fitted The light switch is OFF Turn light switch ON Haloge...

Page 14: ...when removing the food dishes or draining the water Exterior DROP IN HEATED WELL ASSEMBLIES CLEANING Metal Surfaces Stainless steel or aluminium surfaces should be cleaned with hot soapy water or a g...

Page 15: ...eaning Stainless Steel Surfaces The well supports grills and stainless steel dishes should be cleaned with hot soapy water Do not use abrasive pads or cleaners as these may damage surfaces Routines DR...

Page 16: ...separately Site Preparation Ensure the well location and any bench cut outs are made to the precise measurements shown in the Mechanical Drawings Position the well in its allocated working position Us...

Page 17: ...on the well This will interrupt the mains supply to the elements if the well overheats for any reason Water Supply Adjust the flow control valve to achieve an appropriate fill rate on auto fill units...

Page 18: ...ELL ASSEMBLIES SERVICING Caution DO NOT attempt to replace heating elements without isolating the cabinet at the supply switch or by unplugging it from the mains supply Element Replacement CAUTION Thi...

Page 19: ...s located behind the control panel It is connected to the sensing probes and the water Low indicator lamp Water Sensing Probes The water sensing probes are located at various heights in the side of th...

Page 20: ...LIES SPECIFICATIONS CABINET MODEL IN GNH03 IN GNH04 IN GNH05 IN GNH06 IN GNH08 Voltage 230 240 V 50 Hz 1 or 3 Star connected Power 2 5kW 3 3kW 4 1kW 4 9kW 6 5kW Current 1 operation excluding gantry 10...

Page 21: ...s of the following specifications AS NZS 3100 General Requirements for Electrical Equipment IEC 335 Heated Food Cabinets AS NZS 3820 Essential Safety Requirements AS NZS 4417 Marking of Electrical Pro...

Page 22: ...Part No 21966 Rev M February 2016 22 Heated Well GN Series ELECTRICAL CIRCUIT DIAGRAMS Model IN GNH03 Drop in Heated Well 3 Pan Bain Marie Model IN GNH03 Auto fill Drop in Heated Well 3 Pan Bain Marie...

Page 23: ...IN GNH03 4 5 6 8 23 Future Products Group ELECTRICAL CIRCUIT DIAGRAMS Continued Model IN GNH04 Drop in Heated Well 4 Pan Bain Marie Model IN GNH04 Auto fill Drop in Heated Well 4 Pan Bain Marie...

Page 24: ...No 21966 Rev M February 2016 24 Heated Well GN Series ELECTRICAL CIRCUIT DIAGRAMS Continued Model IN GNH05 Drop in Heated Well 5 Pan Bain Marie Model IN GNH05 Auto fill Drop in Heated Well 5 Pan Bain...

Page 25: ...IN GNH03 4 5 6 8 25 Future Products Group ELECTRICAL CIRCUIT DIAGRAMS Continued Model IN GNH06 Drop in Heated Well 6 Pan Bain Marie Model IN GNH06 Auto fill Drop in Heated Well 6 Pan Bain Marie...

Page 26: ...Part No 21966 Rev M February 2016 26 Heated Well GN Series ELECTRICAL CIRCUIT DIAGRAMS Continued Model IN GNH08 Auto fill Drop in Heated Well 8 Pan Bain Marie...

Page 27: ...warranty conditions and ensure optimum performance use only FPG supplied spare parts Part Description FPG Part No Mains isolation switch 3 pole 11870 On Off Switch 14372 Knob for On Off switch 14374 M...

Page 28: ...Part No 21966 Rev M February 2016 28 Heated Well GN Series MECHANICAL DRAWINGS Dimensions DROP IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS IN GNH03 to GNH06...

Page 29: ...IN GNH03 4 5 6 8 29 Future Products Group IN GNH08...

Page 30: ...Part No 21966 Rev M February 2016 30 Heated Well GN Series Bench Cut outs DROP IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS Over Mount Installation...

Page 31: ...IN GNH03 4 5 6 8 31 Future Products Group Flush Mount Installation...

Page 32: ...Part No 21966 Rev M February 2016 32 Heated Well GN Series Under Mount Installation...

Page 33: ...IN GNH03 4 5 6 8 33 Future Products Group Auto fill Components DROP IN HEATED WELL ASSEMBLIES MECHANICAL DRAWINGS...

Page 34: ...Part No 21966 Rev M February 2016 34 Heated Well GN Series...

Page 35: ...IN GNH03 4 5 6 8 35 Future Products Group...

Page 36: ...Part No 21966 Rev M February 2016...

Reviews: