Installation and
Operating Manual
Forno Bravo
Casa2G and Premio2G
Residential Modular Refractory Ovens
16
©Forno Bravo, LLC 2019. All Rights Reserved.
Ver. 2.0
Oven Floor Assembly
Assemble and level the cooking floor on a bed of fine
sand.
Oven Dome Assembly
Assemble the oven dome and seal the outside of the oven
dome seams with refractory mortar. Do not put mortar
inside the joints or between the oven pieces. Seal the
bottom of the dome and the oven landing to the insulation
board using refractory mortar.
Chimney Assembly
Coat the bottom of the chimney with fireplace caulk and
slide the chimney into the round vent opening. Seal the
chimney and vent with additional fireplace caulk.
For UL103 installation, screw the chimney system anchor
place in place using chimney caulk to seal.
For refractory chimney installation, follow the instructions
in Chapter 6 of this manual.
Cucina Stand Option