BEARERS & FLOOR PANELS
Lay the bearers down and spread them out roughly
ready to position the floor panels on top.
Ensure the panel is flush to the edges of the first
bearer. Ensure the floor panel on the bearers are
level using a spirit level as a guide.
3
3
55
11
22
Pre-drill for every process before securing with
screws. Pre-drill 5 holes along the edge of the first
floor panel. Do not screw in the other side at the
moment.
Using 125mm screws, screw through the floor
panel into the floor bearer beneath. Repeat the
process for the 4 other screws. Ensure each screw
is countersunk.
Place the second floor panel (A) onto the middle
and end bearers. Ensure the panel is positioned
half way on the middle bearer.
Place the first floor panel (B) on flush to the edge
of the first bearer and halfway onto the second
bearer. Place the black underside of the floor panel
on top of the bearers as shown above.
4
4
66
5