EXTERNAL T&G CLADDING & FASCIA’S
Install the Front T&G Panel (AU). Ensure it is
butted up against the side panel and flush to the
door section. Secure the panel with 6 x 80mm
screws (3 screws down each side).
111
111
Repeat the same process as the lintel for the Kick
Plate T&G Panel (BK) that goes underneath the
door opening.
115
115
Using 2 x 80mm screws, secure the side fascia.
Ensure this is flush to the top and front, whilst
butting up against the T&G side panel. Repeat this
process for the other side.
117
117
Install the Lintel T&G Panel (AW). This will fit
between the front panels. Use 6 x 80mm screws.
Make sure to drill through the battens beneath.
114
114
Use 3 x 80mm screws to secure the Window
Opening Panel (BC) to the Front T&G Panel (AU).
112
112
Repeat the process for the other Front T&G Panel
(AU).
113
113
Position the front fascia. Ensure it is flush to the
top and to the outer faces of the side fascias. Use
6 x 80mm screws centrally across the fascia.
118
118
Install the Canopy T&G Panels (BJ) one at a time.
Ensure they are flush to all edges. Use 6 x 80mm
screws per panel.
116
116
21