BREATHABLE MEMBRANE
Begin to unwrap the breathable membrane.
Position the membrane 45mm from the ground.
83
83
Once the starting point has been overlapped, cut
off the excess and staple the end of the material
into place.
87
87
Add additional staples to keep the membrane in
place. Be careful not to staple into the door and
window gaps.
89
89
Continue unwrapping the membrane, pulling
tightly and stapling into place.
86
86
Starting with the bottom section, pull the
membrane tightly and staple into place.
84
84
Then wrap the excess around the corner and
staple the starting point into place.
85
85
There will be a slight gap at the front and on the
sides due to the angle of the roof.
90
90
Repeat the same process for the top half of the
building. Ensure the starting point is flush to the
top of the back wall panels.
88
88