background image

General Lit Switch (Green) (1)

When the switch is in the 0 position
the boiler is switched off and the
switch is not lit.
When the switch is in the I position
the boiler is switched on and the
switch is lit.

Reset Button (2)

When the reset button is pressed
the boiler is restarted.

Temperature adjustment for the
heating water (3)

This knob is used to set the tempe-
rature for the water in the heating
system.

It can be set between a

minimum of 45°C and a maximum of
85°C.

Heating Function LED (Yellow) (4)

This LED indicates that the system
is calling for heating.

Excess Temperature Cut-Out LED
(Red) (5)

This light indicates that the cut-out
connected to the safety thermostat
has tripped due to malfunctioning. It
must be reset manually.

Burner cut-out LED (Red) (6)

This light indicates that the burner
safety device has tripped due to a
malfunction.

Burner operation LED (Yellow) (7)

This light indicates that the burner is
operating.

Thermometer/Pressure Gauge (8)

The thermometer/pressure gauge’s
function is to display the temperatu-
re and pressure of the water in the
boiler.

Manual excess temperature cut-
out  reset (9)

The thermostat reset button can be
accessed by removing the protective
cover. The safety thermostat is used
to protect the boiler in case of a fault.

1. INSTRUCTIONS FOR THE USER

1.1 CONTROL PANEL

4

1

. General switch with line light (Green)

2

. Reset Button

3

. Temperature adjustment for the heating water

4

. Heating Pump operation light (Yellow)

5

. Excess Temperature Cut-Out LED (Red)

6.

Burner cut-out LED

7

. Burner operation LED (Yellow)

8

. Thermometer 

9

. Safety thermostat-reset manually.

fig. 1

Summary of Contents for BALI RTFS E 18

Page 1: ...BALI RTFS IST 03 C 080 01 INSTALLATION OPERATION AND MAINTENANCE CE 49BN3788 GB...

Page 2: ...1 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Page 3: ...o specific separated collection areas Keep the packing out of reach of chil dren as by its very nature it may constitute a source of danger Should the equipment break down and or function defectively...

Page 4: ...3 2 1 Packing pag 9 3 2 2 Choosing the installation position for the boiler pag 9 3 2 3 Installing the Boiler pag 9 3 2 4 Ventilation of Boiler Rooms pag 9 3 2 5 Smoke stack system pag 9 3 2 6 On site...

Page 5: ...tioning It must be reset manually Burner cut out LED Red 6 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED Yellow 7 This light indicates that t...

Page 6: ...fety thermo stat cut out has tripped and must be reset manually This is due to an operating fault and an authorised Service Centre or qualified person nel must be contacted for mainte nance 1 2 4 Cut...

Page 7: ...ed for in the current stan dards for this type of product The main technical characteristics of the BALI boiler are listed below High performance cast iron heat exchanger Insulation in glass wool with...

Page 8: ...GAS G 1 2 G 1 2 G 1 2 G 1 2 RETURN G 1 G 1 G 1 G 1 FEED G 1 G 1 G 1 G 1 Model RTFS E 18 RTFS E 24 RTFS E 32 RTFS E 36 L 510 510 610 610 2 2 Dimensions 7 fig 2...

Page 9: ...V Hz W A C Kg h N mm mm mbar Stm3 h mm C Kg h N mm mm mbar kg h EC Performance Class EC PIN Category Type Thermal Power Thermal Capacity Performance at nominal load Performance at reduced load 30 Main...

Page 10: ...ler to the system s feed and return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch h...

Page 11: ...smoke flue pipe must be at least 250 mm and both terminals are to be positioned within a square with 500 mm sides The smoke flue is to comply with cur rent standards Air intake smoke flue double 80 mm...

Page 12: ...mp to prevent it being torn out This boiler must be connected to a 230V 50Hz electrical power supply When forming the connection respect the phase neutral polarity Installation standards must be com p...

Page 13: ...with a drain stopcock at the front of the unit that can be used to empty the system 3 4 Starting the Boiler 3 4 1 Preliminary Checks Before starting the boiler it is best to check that The smoke flue...

Page 14: ...R on the printed circuit VG Gas valve TM Contact Timer optional mar ked TIMER on the printed cir cuit PZ Ignition spark unit PA Water pressure switch optio nal marked with the pressure switch symbol o...

Page 15: ...that indicates the type of gas and pres sure for which the equipment is set 4 MAINTENANCE In order to ensure that the equip ment is efficient and that it functions correctly maintenance must be car ri...

Page 16: ...ocenigo 123 Tel 0365 878 31 Fax 0365 878361 e mail fondital fondital it export01 fondital it www fondital it Fondital reserves the right to make any changes it deems necessary without notice Fondital...

Reviews: