background image

3.1 Installation Standards

This BALI boiler must be installed in
compliance with current laws and
standards, which are taken as being
an integral part of this booklet.

3.2 Installation

3.2.1 Packing

BALI boilers are supplied packed in
a strong cardboard box on a wooden
pallet. On removing the cardboard
box make sure that the boiler is
complete.
The packing materials can be recy-
cled. Dispose of them via specific
waste collection points.

Keep the packing out of reach of
children, as, by its very nature, it
may constitute a source of danger.
FONDITAL accepts no responsi-
bility for damage to people, ani-
mals, or property due to failure to
observe the instruction above.

The pack contains a packet in which
you will find:
a) The installation, operation, and
maintenance manual.
b) The guarantee certificate.
c) The booklet for the plant or unit,
depending on the model.

3.2.2 Choosing the installation
position for the boiler

The following must be taken into
account when choosing where to
install the boiler:
•  It is advisable to leave at least 50
cm on each side of the boiler to faci-
litate future maintenance.
•  Do not install in damp or dusty
rooms.
• The boiler room must not be
accessible to outsiders, children, or
animals.

3.2.3 Installing the Boiler

Before connecting the boiler to the
piping for the hot water and heating
systems, clean the piping carefully
to eliminate any metal residue left
during working and welding, and
any oil or grease that may be left
and that could damage the boiler or
alter the way it works if it reaches
the boiler.

NB: Do not use solvents as these
could damage the components.
FONDITAL

accepts no responsibi-

lity for damage to people, animals,
or property due to failure to observe
the instructions above.
To install the boiler proceed as follows:
• Unscrew the four screws that
attach the brackets that connect the
boiler to the timber pallet (Fig. 3)
•  Remove the boiler from the pallet
without damaging it.
•  Put spacers between the floor and
the boiler’s feet if necessary, to
make the installation stable.
•  Connect the boiler to the system’s
feed and return pipes.
• Remember that the plumbing
system must include all the safety and
control elements required in terms of
current standards (safety valve, water
pressure switch, heat discharge valve,
pressure gauge, etc.).
•  Connect the boiler up to the air
intake and flue pipes.
•  Connect the ambient thermostat,
the heating pump, and the heating
water pressure switch to the electri-
cal system.
•  Connect up the electricity supply.

3.2.4 Ventilation of Boiler Rooms

BALI RTFS boilers have airtight
combustion chambers.
It is obligatory that the boiler be
installed in an adequate room in
terms of the current standard,

which is taken as an integral part
of this booklet.

3.2.5 Smoke discharge and com-
bustion-supporting air intake
system

BALI boilers have a coupling for a
flue pipe and another coupling for a
combustion-supporting air intake,

both of which are suitable for con-
necting up to 80 mm diameter pipes.
The smoke ducts from the boiler are
to be connected to a smoke flue for-
med as indicated in current stan-
dards, 

which are taken as being

an integral part of this booklet.

Type C12

This boiler is designed to be con-
nected up to horizontal flue and
intake terminals, connected to the
outside air by means of a coaxial
pipe or double pipes.
The distance between the air intake
pipe and the smoke flue pipe must
be at least 250 mm and both termi-
nals are to be positioned within a
square with 500 mm sides.

• Air intake/smoke flue coaxial pipe,
diameter  60/100 mm.

Configuration allowed:
N° 1 flanged stub pipe
N° 3 metres coaxial pipe
N° 1 intake/flue terminal.

Notes:

-  Reduce the maximum length by 1
metre for each 90° bend.
-  Reduce the maximum length by 0,5
metres for each 45° bend.
- Models

RTFS 18 and RTFS 24

: for

installations with an equivalent length
of less than 1 metre, install a 75 mm
diaphragm.
- Model

RTFS 32

: for all installations,

install a 78 mm diaphragm.

RTFS 36

models: for installations

with an equivalent length of less than
1 metre, install a 78 mm diaphragm.

• Air intake/smoke flue double 80
mm diameter piping

Configuration allowed:
N° 2 flanged stub pipes
N° 19 metres of air intake piping
N° 19 metres of smoke flue piping
N° 1 air intake terminal
N° 1 smoke flue terminal

3. INSTRUCTIONS FOR THE INSTALLER

9

fig. 3

Summary of Contents for BALI RTFS E 18

Page 1: ...BALI RTFS IST 03 C 080 01 INSTALLATION OPERATION AND MAINTENANCE CE 49BN3788 GB...

Page 2: ...1 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Page 3: ...o specific separated collection areas Keep the packing out of reach of chil dren as by its very nature it may constitute a source of danger Should the equipment break down and or function defectively...

Page 4: ...3 2 1 Packing pag 9 3 2 2 Choosing the installation position for the boiler pag 9 3 2 3 Installing the Boiler pag 9 3 2 4 Ventilation of Boiler Rooms pag 9 3 2 5 Smoke stack system pag 9 3 2 6 On site...

Page 5: ...tioning It must be reset manually Burner cut out LED Red 6 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED Yellow 7 This light indicates that t...

Page 6: ...fety thermo stat cut out has tripped and must be reset manually This is due to an operating fault and an authorised Service Centre or qualified person nel must be contacted for mainte nance 1 2 4 Cut...

Page 7: ...ed for in the current stan dards for this type of product The main technical characteristics of the BALI boiler are listed below High performance cast iron heat exchanger Insulation in glass wool with...

Page 8: ...GAS G 1 2 G 1 2 G 1 2 G 1 2 RETURN G 1 G 1 G 1 G 1 FEED G 1 G 1 G 1 G 1 Model RTFS E 18 RTFS E 24 RTFS E 32 RTFS E 36 L 510 510 610 610 2 2 Dimensions 7 fig 2...

Page 9: ...V Hz W A C Kg h N mm mm mbar Stm3 h mm C Kg h N mm mm mbar kg h EC Performance Class EC PIN Category Type Thermal Power Thermal Capacity Performance at nominal load Performance at reduced load 30 Main...

Page 10: ...ler to the system s feed and return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch h...

Page 11: ...smoke flue pipe must be at least 250 mm and both terminals are to be positioned within a square with 500 mm sides The smoke flue is to comply with cur rent standards Air intake smoke flue double 80 mm...

Page 12: ...mp to prevent it being torn out This boiler must be connected to a 230V 50Hz electrical power supply When forming the connection respect the phase neutral polarity Installation standards must be com p...

Page 13: ...with a drain stopcock at the front of the unit that can be used to empty the system 3 4 Starting the Boiler 3 4 1 Preliminary Checks Before starting the boiler it is best to check that The smoke flue...

Page 14: ...R on the printed circuit VG Gas valve TM Contact Timer optional mar ked TIMER on the printed cir cuit PZ Ignition spark unit PA Water pressure switch optio nal marked with the pressure switch symbol o...

Page 15: ...that indicates the type of gas and pres sure for which the equipment is set 4 MAINTENANCE In order to ensure that the equip ment is efficient and that it functions correctly maintenance must be car ri...

Page 16: ...ocenigo 123 Tel 0365 878 31 Fax 0365 878361 e mail fondital fondital it export01 fondital it www fondital it Fondital reserves the right to make any changes it deems necessary without notice Fondital...

Reviews: