background image

Warnings

pag. 1

General Notes for the Installer, Maintenance Technician and User

pag. 2

1

Instructions for the User

pag. 4

1.1

Control Panel

pag. 4

1.2

Operating the Boiler

pag. 5

1.2.1 Starting Up

pag. 5

1.2.2 Burner Cut-Out

pag. 5

1.2.3 Cut-Out  Excess Temperature

pag. 5

1.3

Maintenance

pag. 5

1.4

Notes for the User

pag. 5

2

Technical Characteristics and Dimensions

pag. 6

2.1

Technical Characteristics

pag. 6

2.2

Dimensions

pag. 7

2.3

Operating Data

pag. 8

3

Instructions for the Installer

pag. 9

3.1

Installation Standards

pag. 9

3.2    Installation

pag. 9

3.2.1 Packing

pag. 9

3.2.2 Choosing the installation position for the boiler

pag. 9

3.2.3 Installing the Boiler

pag. 9

3.2.4 Ventilation of Boiler Rooms

pag. 9

3.2.5 Smoke stack system

pag. 9

3.2.6 On site measurement of combustion performance

pag. 11

3.2.7 Connecting to the gas mains

pag. 11

3.2.8 Connecting to the electricity power supply 

pag. 12

3.2.9 Plumbing Connections

pag. 12

3.2.10 Installation of original kits

pag. 12

3.3

Filling the system

pag. 12

3.4

Starting the Boiler

pag. 12

3.4.1 Preliminary Checks

pag. 12

3.4.2 Starting Up and Switching Off

pag. 12

3.5

Wiring Diagrams

pag. 13

3.6.

Gas Transformation

pag. 14

3.6.2 Change over from natural gas to LPG

pag. 14

3.6.1 Change over from LPG to natural gas

pag. 14

4

Maintenance

pag. 14

3

INDICE

Summary of Contents for BALI RTFS E 18

Page 1: ...BALI RTFS IST 03 C 080 01 INSTALLATION OPERATION AND MAINTENANCE CE 49BN3788 GB...

Page 2: ...1 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Page 3: ...o specific separated collection areas Keep the packing out of reach of chil dren as by its very nature it may constitute a source of danger Should the equipment break down and or function defectively...

Page 4: ...3 2 1 Packing pag 9 3 2 2 Choosing the installation position for the boiler pag 9 3 2 3 Installing the Boiler pag 9 3 2 4 Ventilation of Boiler Rooms pag 9 3 2 5 Smoke stack system pag 9 3 2 6 On site...

Page 5: ...tioning It must be reset manually Burner cut out LED Red 6 This light indicates that the burner safety device has tripped due to a malfunction Burner operation LED Yellow 7 This light indicates that t...

Page 6: ...fety thermo stat cut out has tripped and must be reset manually This is due to an operating fault and an authorised Service Centre or qualified person nel must be contacted for mainte nance 1 2 4 Cut...

Page 7: ...ed for in the current stan dards for this type of product The main technical characteristics of the BALI boiler are listed below High performance cast iron heat exchanger Insulation in glass wool with...

Page 8: ...GAS G 1 2 G 1 2 G 1 2 G 1 2 RETURN G 1 G 1 G 1 G 1 FEED G 1 G 1 G 1 G 1 Model RTFS E 18 RTFS E 24 RTFS E 32 RTFS E 36 L 510 510 610 610 2 2 Dimensions 7 fig 2...

Page 9: ...V Hz W A C Kg h N mm mm mbar Stm3 h mm C Kg h N mm mm mbar kg h EC Performance Class EC PIN Category Type Thermal Power Thermal Capacity Performance at nominal load Performance at reduced load 30 Main...

Page 10: ...ler to the system s feed and return pipes Remember that the plumbing system must include all the safety and control elements required in terms of current standards safety valve water pressure switch h...

Page 11: ...smoke flue pipe must be at least 250 mm and both terminals are to be positioned within a square with 500 mm sides The smoke flue is to comply with cur rent standards Air intake smoke flue double 80 mm...

Page 12: ...mp to prevent it being torn out This boiler must be connected to a 230V 50Hz electrical power supply When forming the connection respect the phase neutral polarity Installation standards must be com p...

Page 13: ...with a drain stopcock at the front of the unit that can be used to empty the system 3 4 Starting the Boiler 3 4 1 Preliminary Checks Before starting the boiler it is best to check that The smoke flue...

Page 14: ...R on the printed circuit VG Gas valve TM Contact Timer optional mar ked TIMER on the printed cir cuit PZ Ignition spark unit PA Water pressure switch optio nal marked with the pressure switch symbol o...

Page 15: ...that indicates the type of gas and pres sure for which the equipment is set 4 MAINTENANCE In order to ensure that the equip ment is efficient and that it functions correctly maintenance must be car ri...

Page 16: ...ocenigo 123 Tel 0365 878 31 Fax 0365 878361 e mail fondital fondital it export01 fondital it www fondital it Fondital reserves the right to make any changes it deems necessary without notice Fondital...

Reviews: