![Foley 622 SO Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/foley/622-so/622-so_operators-manual_2314852015.webp)
15
- ORIGINAL INSTRUCTIONS -
INSTALLATION INSTRUCTIONS
120 VOLT MODEL ONLY.
Plug the control box power cord into a standard 120 V ac
20-amp, grounded receptacle. See FIG. 7. When installing the grinder, the following
guidelines should be used to establish the wire size between the power panel in your
building and the grinder receptacle. Note that the wiring in your building must be per
code between the main power panel and sub panels.
120 V ac 20 AMP
STANDARD PLUG FOR
NORTH AMERICA.
FIG.7
230 V 50/60Hz MODEL
230 V machines are installed with a 3 KVA 230 V step-down transformer which is used to convert the power
delivered to the electrical control to 110 V. The transformer wiring diagram is shown in FIG. 8. A connector,
that complies with code for your location and a 230 V, 10 A application, should be installed if there is not one
already on the end of the main power cord.
USE ONLY A QUALIFIED
ELECTRICIAN TO
COMPLETE THE
INSTALLATION.
FIG. 8
1.
Individually wire nut Transformer Leads H2, H3, H4, H7, H8
and
H9.
2.
Install the Green with Yellow Stripe wire supplied into the terminal block in the hole opposite wire X3 as
shown. To install the wire insert a small screwdriver into the cavity marked "
A
" to open the wire hole.
3.
Attach the other end of the Green with Yellow Stripe wire supplied to the ground stud on the transformer.
14 G. (2.5MM) GREEN
WITH YELLOW STRIPE
GROUNDWIRE TO BE
ADDED.
GREEN WITH YELLOW STRIPE
GROUND WIRE
GREEN WITH YELLOW STRIPE
GROUND WIRE
BROWN
LIGHT BLUE NEUTRAL
LIGHT BLUE
NEUTRAL
BROWN
POWER IN 230V, 1 PHASE
POWER OUT 110V, 1PHASE
FOR 20 AMP-RATED LARGE MACHINE
Distance from Electrical Panel to
the Electrical Outlet Receptacle
Size of Wire Required
English (feet) Metric (meters) English (Gauge) Metric (mm)
0-40
0-12
12
4.0
40-60
12-18
10
6.0
60-100
18-30
8
10.0
100-160
30-48
6
16.0
Summary of Contents for 622 SO
Page 32: ...32 ORIGINAL INSTRUCTIONS...