C/CE
7. Installation position of sensor
Pipe to the highest point (Gathered bubble
in tube to make error measurement)
Preferred position
(Sensor cannot be installed at highest level of pipeline)
Easily lead to non-full
pipes (wrong measurement way)
P l s p u t f l o w m e t e r i n t o l o w p o s i t i o n ,
e x p o s u r e f o r I n j e c t i o n o r d i s c h a r g e
P l s i n s t a l l e x h a u s t v a l v e i f
d r o p p i p e l o n g e r t h a n 5 M .
5m
Exhaust valve
p i c t u r e 5 r e c o m m e n d i n s t a l l a t i o n
In order to enable reliable flow meter, Pls note the following installation requirements
:
1. As far as possible to avoid ferromagnetic objects and equipment with strong magnetic fields
(big electric machine, big transformer) is protecting of the magnetic field sensor.
2.Flow meter should be enough space around for easy installation and Maintenance.
I n l o n g e r p i p e s y s t e m , p l s i n s t a l l
c o n t r o l v a l v e a n d C u t - o ff v a l v e o n
t h e f l o w m e t e r D o w n s t r e a m s i d e
P u m p : P r o h i b i t e d t o i n s t a l l
f l o w m e t e r a t s u c t i o n
s i d e ( Va c u u m )
07
SENSORS PARTS
Http: // www.flowmeter.cc
SENSORS
C
/C
E
C/CE
C
/C
E
C/CE
C/CE
C/CE
C/CE