LED LIGHT INSTALL AND POWER
It is best if LED lights are connected and tested during the initial stages of installation to allow easy access under the
unit (before the wall finishing material is done).
Testing the LED light requires a 110V power source.
Installation steps:
1.
Remove all LED components from the shipping bag.
2.
Components are pre-connected prior to shipping. Connect LED connectors (points
A
) to the fireplace using
the quick connect connectors.
3.
Connect LED control system to the power supply (point
B
)
4.
Connect LED Power supply to an external power source (point
C
). Do not connect the LED to the Flare control
LED plug at this point. Use the LED remote to turn the LED on the LED system.
Once testing is done, connect the LED power adapter to final power source (Point
C
), Option 1 or Option 2 as
detailed in the previous page.
Power outlet on the Flare control is optional for LED ONLY
Summary of Contents for Flare Corner Right & Left 30-100"
Page 5: ...5 P a g e SAFETY INFO AND WARNINGS...
Page 9: ...9 P a g e FIREPLACE OPERATION REMOTE CONTROL INSTRUCTIONS...
Page 10: ...10 P a g e...
Page 11: ...11 P a g e...
Page 12: ...12 P a g e...
Page 75: ...75 P a g e EXAMPLES OF HEAT RELEASES...
Page 85: ...85 P a g e ELECTRIC AND CONTROL ELECTRIC DIAGRAM SCREEN Optional 6V power supply and remote...
Page 86: ...86 P a g e DIAGRAM DOUBLE GLASS AND POWER VENT BLUE RECEIVER RELAY GREEN RECEIVER AUX...
Page 88: ...88 P a g e ELECTRIC DIAGRAM PV SYSTEM Ports 49 47 are connected to J6 on fireplace main board...
Page 96: ...96 P a g e Figure 1 Figure 2 Figure 3 Figure 4 Figure 5...
Page 97: ...97 P a g e Figure 6 Figure 7...