22
LT6498 (ISS 2)
SECTION NINE To Install the Appliance (Installation Instructions)
CHECKING THE FLUE AND FIRE OPENING
Check that the chimney conforms to the required specifications as previously stated. Examine the condition
and carry out any remedial work including removing any debris from the base.
If the flue has been used for solid fuel it should be swept prior to the installation
Prior to installing the appliance a smoke test (using a smoke bomb) should be carried out to check that
satisfactory smoke clearance has been established.
If all the smoke is not drawn into the flue, pre-heat the flue with a blowtorch or similar and re-check. If there is any
uncertainty examine for the cause and, if necessary, seek expert advice.
No combustible material should be fitted inside the fireplace opening.
GAS SUPPLY ROUTING :-
Use rigid or semi – rigid tube to connect the supply. Determine the gas supply pipe route to the appliance before
installing the Stove.
CONNECTING THE GAS SUPPLY :-
The gas connection is underneath the Stove towards the front on the right hand side, The burner tray inlet pipe drops
down through the stove and the test point nipple and isolation point can be connected there. The gas supply pipe can
be routed either from the sides or rear.