
Initial Power-up
38
Document #51003 Rev.E 01/11/02 P/N 51003:E
1 = Programming: There are two programming levels.
• Program Level 1 is for system configuration in which data relating to device types, zoning, messages, etc. is
entered into the system memory
• Program Level 2 is where a qualified operator can access features such as Disable, Clear History, Walktest,
Time Change and Program Check. For Program Level 2, the SW1 Write Protect switch should remain in the
up 'Write Protect' position
2 = Read Status: Entering Read Status allows the user to read the status of any point/zone in the system plus display
or print the history file or print the entire user program or print addressable smoke detector data readings. The Read
Status feature is NOT password protected. Read Status is explained in “Operating Instructions” on page 51.
3 = Read BAT: Entering RD BAT allows the user to read the battery voltage. The RD BAT feature is NOT password
protected. The following screen is displayed upon entering RD BAT:
“Initial Power-up” describes initial programming procedures for a new system. The same procedures are used to
modify programming in an existing system. Make certain the SW1 Write Protect switch is in the down position
before attempting any Level 1 Programming functions.
3.1
Initial Power-up
After completing the wiring of addressable devices to the SLC loop, power up the fire alarm system. Since the
addressable devices have not yet been programmed into the FACP, their LEDs will not flash, the System Trouble
LED will be on and the LCD display will alternate between the following two displays:
If the system remains unprogrammed, the piezo will sound after a few minutes. It can be silenced by pressing the
Acknowledge/Step switch, but it will continue to resound until the system is programmed.
BATTERY: 24.00 V.
TROUBLE IN SYSTEM
PROGRAM CORRUPTED
TROUBLE IN SYSTEM
NO DEVICES INSTALL