Basic rules for addressing
A CPV valve terminal always occupies 16 outputs, irrespective
of the number of valve solenoid coils fitted. This enables the
CPV valve terminal to be extended at a later date without the
need to shift addresses.
The diagram below shows the addressing sequence of the indi
vidual CPV valve plates.
0
−
1
2
−
3
4
−
5
6
−
7
8
−
9
10
−
11
12
−
13
14
−
15
Fig.2/4: Address assignment of a CPV valve terminal
Summary of Contents for Compact Performance CPV Series
Page 2: ......
Page 4: ...Contents and general safety instructions II Festo P BE CP SD8 EN en 0503b...
Page 12: ...Contents and general safety instructions X Festo P BE CP SD8 EN en 0503b...
Page 13: ...Installation 1 1 Festo P BE CP SD8 EN en 0503b Chapter 1...
Page 38: ...1 Installation 1 26 Festo P BE CP SD8 EN en 0503b...
Page 39: ...Commissioning 2 1 Festo P BE CP SD8 EN en 0503b Chapter 2...
Page 48: ...2 Commissioning 2 10 Festo P BE CP SD8 EN en 0503b...
Page 49: ...Diagnosis 3 1 Festo P BE CP SD8 EN en 0503b Chapter 3...
Page 60: ...3 Diagnosis 3 12 Festo P BE CP SD8 EN en 0503b...
Page 61: ...Technical Appendix A 1 Festo P BE CP SD8 EN en 0503b Appendix A...
Page 68: ...A Technical Appendix A 8 Festo P BE CP SD8 EN en 0503b...
Page 69: ...Index B 1 Festo P BE CP SD8 EN en 0503b Appendix B...
Page 70: ...B Index B 2 Festo P BE CP SD8 EN en 0503b Contents Index B 1...