KIN PANEL
26
INSTALLATION
4.1. FLUSH BOX INSTALLATION
4.2
.
INSTALLATION GUIDE DIAGRAM
Flush box install.
Base flush box depth
adjustment hook.
The upper part of the panel is
stuck in, then move the panel to
the flush box.
Move the slider of the panel and fix
the two screws. When installing,
pay attention to the reservation of
the 2 cm space around the door to
move the slide cover.
1
2
3
4