FED ALL
CARGO COMPARTMENT TEMPERATURE CONTROL - ADJUSTMENT/TEST
1.
Operational Test
WARNING :
BEFORE POWER IS SUPPLIED TO THE AIRCRAFT, MAKE CERTAIN
THAT ELECTRICAL CIRCUITS UPON WHICH WORK IS IN PROGRESS
ARE ISOLATED.
A.
Reason for the Job
(1)
To check operation of the cargo compartment temperature
control system and interface with smoke detection system.
B.
Equipment and Materials
ITEM
DESIGNATION
(1)
Electrical Ground Power Unit - 3-
Phase,
115/200 V, 400 Hz
Referenced Procedures
-
(Ref. 24-41-00, P. Block 301 )
-
(Ref. 33-17-00, P. Block 501 )
-
(Ref. 31-51-00, P. Block 201 )
AC External Power Control
Memorized Fault Annunciators
ECAM Sxstem
FED 401-405,407-414,423-430,443,445
POST SB 31-2059 for A/C 401-405,407-414,423-430,443,445
Referenced Procedures
-
(Ref. 24-41-00, P. Block 301 )
-
(Ref. 32-00-00, P. Block 501 )
-
(Ref. 33-17-00, P. Block 501 )
-
(Ref. 31-51-00, P. Block 201 )
AC External Power Control
Landing Gear - General
Memorized Fault Annunciators
ECAM System
A310-200 AMM - CARGO COMPARTMENT
TEMPERATURE CONTROL - ADJUSTMENT/TEST
Revision 32.0
P.Blk EFFECTIVITY: FED ALL
21-64-00-05
Printed - Date: 12/11/12 Time:
Copyright © 12 FedEx Express Corporation, Memphis TN, 38194, All rights reserved.
Page 1 of 106
JUN 01/2012