![Federal Signal Corporation Personnel Alerting System Installation And Operation Instructions Manual Download Page 74](http://html.mh-extra.com/html/federal-signal-corporation/personnel-alerting-system/personnel-alerting-system_installation-and-operation-instructions-manual_548462074.webp)
PRE-OPERATION CHECK-OUT AND TEST
74
output level. A small straight blade
screwdriver can be used to adjust the
microphone sensitivity. The nominal
level should be set to approximately
zero dBm out of the control panel. The
speaker level may also be adjusted at
the UVIC control board by adjusting
R111. R111 should be set to provide
10Vp-p at TP1 on the control board
when the UVLOC is putting out 0dBm.
After the levels have been properly
adjusted, verify all other functions
operate properly from the UVLOC
control panel.
The UVLOC should be labeled to
ensure the operators will know what
messages and functions are available.
Verify the UVLOC is labeled properly for
the application.
Summary of Contents for Personnel Alerting System
Page 49: ...INSTALLATION 49 Figure 5 2 UVIC Cabinet Dimensional Outline Drawing ...
Page 50: ...INSTALLATION 50 Figure 5 3 UVIC Wiring Diagram ...
Page 51: ...INSTALLATION 51 Figure 5 4 UVIC Battery Connections ...
Page 62: ...INSTALLATION 62 Figure 5 5 Yagi Antenna Installation Example ...
Page 63: ...INSTALLATION 63 Figure 5 6 Omni Antenna Installation Example ...
Page 64: ...INSTALLATION 64 Figure 5 7 Antenna Grounding Example ...
Page 69: ...INSTALLATION 69 Figure 5 10 UVLOC Dimensional Outline ...
Page 70: ...INSTALLATION 70 Figure 5 11 UVIC25SD Field Wiring Diagram ...
Page 83: ...83 Figure 9 1 UVIC Final Assembly and Parts List Page 2 of 2 ...
Page 84: ...UVIC Final Assembly and Parts List 84 Figure 9 2 UVIC25ST Wiring Detail ...