![Federal Signal Corporation Personnel Alerting System Installation And Operation Instructions Manual Download Page 54](http://html.mh-extra.com/html/federal-signal-corporation/personnel-alerting-system/personnel-alerting-system_installation-and-operation-instructions-manual_548462054.webp)
INSTALLATION
54
Wood Stud Wall Mounting
Materials
Material
Description
Purpose
Qty
3/8” x 3” Lag
bolts
Backboard &
cabinet
mounting bolts
8
24” x 36” x
¾” B/C or
better
plywood
Mounting
backboard
1
Construction
adhesive
Mounting
backboard
attachment
1
Wood Stud Wall Mounting Guidelines:
1. Locate the wall studs for attaching the
mounting backboard to the wall. The
backboard should attach to at least
two studs.
2. Mark the wall stud location on the
mounting backboard and drill four
pilot holes for the 3/8” lag bolts.
3. Apply construction adhesive to the
back of the mounting backboard.
4. Attach the mounting backboard to the
wall with four 3/8” x 3” lag bolts.
5. Locate the mounting position of the
cabinet on the mounting backboard.
6. Drill pilot holes for the 3/8” x 3” lag
bolts.
7. Mount the cabinet to the mounting
backboard.
8. Proceed to the following section.
Summary of Contents for Personnel Alerting System
Page 49: ...INSTALLATION 49 Figure 5 2 UVIC Cabinet Dimensional Outline Drawing ...
Page 50: ...INSTALLATION 50 Figure 5 3 UVIC Wiring Diagram ...
Page 51: ...INSTALLATION 51 Figure 5 4 UVIC Battery Connections ...
Page 62: ...INSTALLATION 62 Figure 5 5 Yagi Antenna Installation Example ...
Page 63: ...INSTALLATION 63 Figure 5 6 Omni Antenna Installation Example ...
Page 64: ...INSTALLATION 64 Figure 5 7 Antenna Grounding Example ...
Page 69: ...INSTALLATION 69 Figure 5 10 UVLOC Dimensional Outline ...
Page 70: ...INSTALLATION 70 Figure 5 11 UVIC25SD Field Wiring Diagram ...
Page 83: ...83 Figure 9 1 UVIC Final Assembly and Parts List Page 2 of 2 ...
Page 84: ...UVIC Final Assembly and Parts List 84 Figure 9 2 UVIC25ST Wiring Detail ...