MSS
TM
Series
© Copyright 2022 Fluid Equipment Development Company | www.fedco-usa.com
-
56
-
Figure 128 - Lowering Unit Into Mounting
Position
25.
Remove the gauge block and shaft locking
wrench.
26.
Install and apply tension to approved lifting
straps as described in the
Lifting and Han-
dling
section of the
MSS Installation Manual
.
Using proper lifting methods safely lower
unit from vertical position and place back
onto shell cradle in horizontal mounting
position.
27.
Install the shell bolts connecting to the shell
support brackets and re-install the drain line
to the inlet.
Figure 127 - Balance Disc Installation
24.
Proceed by preforming the
Balance Disc
Installation
procedure as described earlier
in this manual.
NOTES:
Although pump is orientated vertically,
the balance disc installation procedure is identi
-
cal to horizontal procedure. Skip the drain line
installation steps.
Figure 126 -
End Shell Installation
23. Carefully lower the end shell over the stag-
es using safe lifting and handling methods.
Align the end shell flange with the series
shell flange (serial number stamping op
-
posite to inlet). Install the shell flange bolts/
lock washers and torque to value specified
in the
Fastener Torque Specifications
sec-
tion of this manual.
NOTES:
Make sure there is no gap between
flanges after tightening bolts.
Pump O
verhaul Continued