MSS
TM
Series
© Copyright 2022 Fluid Equipment Development Company | www.fedco-usa.com
-
55
-
Figure 125 - Discharge Ring Installation
Figure 124 -
Stage Assembly
22. Install the discharge ring onto the last dif-
fuser bowl.
21. For:
Single Shell Pumps:
Skip this step.
Two Shell Pumps:
Lubricate and install the series shell
O-ring.
Continue to assemble pump stages as
described in series shell steps until all end
shell stages have been assembled.
NOTES:
Verify diffuser bushings have been
pre-installed before assembly.
NOTES:
The last end shell stage component
will be a diffuser assembly without an impeller.
Figure 123 - Series Shell Inlet Ring Installation
20. For:
Single Shell Pumps:
Skip this step.
Two Shell Pumps:
Install an inlet ring, wear ring and floating
neck ring into the series shell
Pump O
verhaul Continued