3.3.3 Connection to the power supply
Execute the connections with suitable materials and procedures prescribed by the rules in
force. Do not execute the connection to the net without first disconnecting the external
magneto-thermic.
NOTE
•
At the time of installation always connect first the net 230Vac and then the batteries. In
that way dangerous sparks are avoided.
•
The net input cable to the control panel must be connected to a suitable magneto-
thermic power switch to make easier the maintenance. The minimum section of net
cable must be of 1.5mm.
•
All the cables connected to the control panel must be fireproof. The cable of earth, the
net ground must be connected to the earth clip of net input.
3.4 INSERTION AND REMOVING POINTS
To modify / insert / remove points of a zone, it is necessary to put it in out of service and to
disconnect the cables from the control panel clips.
The user must not install other bypass or expansion which do not belong to same production
range, because the control of the cable status is only guaranteed at the line that has the end of
line resistor.
For the point connections to the zone (detector, button, etc…), the user must reference at the
chapter
PART 9.
3.5 PANEL DESCRIPTION
ZONES
ZONE ALARMS
FAULT-DISABLE/TEST
ZONE BUTTONS
ACCESS LEVEL
SIREN
OUT OF SERVICE
SILENT MODE
RESET
TEST
POWER SUPPLY
ALARM
PREALARM
FAULT
POWER FAULT
SYSTEM FAULT