![Fayat BOMAG BW 213 D-4 Operating Instructions Manual Download Page 89](http://html1.mh-extra.com/html/fayat/bomag-bw-213-d-4/bomag-bw-213-d-4_operating-instructions-manual_3687515089.webp)
5.21 Loading/transport
WARNING!
Danger of accident! Life hazard!
Use only stable loading ramps of sufficient load
bearing capacity. The ramp inclination must be less
than the gradability of the machine.
Make sure that persons are not endangered by the
machine tipping or sliding off.
During demonstration and when loading the machine
do not remain in the danger zone of the machine.
Always use shackles on the lifting points for loading or
tying the machine down.
Check all lifting and lashing points for damage before
lifting or lashing down the machine. Do not use a dam-
aged or in any other way impaired lifting and lashing
eyes.
Lift the machine only with suitable lifting gear. Use only
safe lifting gear of sufficient load bearing capacity Min-
imum lifting capacity of lifting gear: see operating
weight in chapter "Technical Data".
The machine must not swing about when being lifted.
Do not step or stand under suspended loads.
Lash the machine down, so that it is secured against
rolling, sliding and turning over.
After transport release the articulation lock again and
store it in the receptacle.
Lift up the articulation lock and swivel it by 180°.
Fig. 113
Operation
BW 213 D-4
89
Summary of Contents for BOMAG BW 213 D-4
Page 2: ...2 ...
Page 6: ...Table of contents BW 213 D 4 6 ...
Page 7: ...1 Foreword Foreword BW 213 D 4 7 ...
Page 10: ...Fig 2 Fig 3 Foreword BW 213 D 4 10 ...
Page 11: ...2 Technical Data Technical Data BW 213 D 4 11 ...
Page 15: ...3 Safety regulations Safety regulations BW 213 D 4 15 ...
Page 29: ...4 Indicators and Controls Indicators and Controls BW 213 D 4 29 ...
Page 30: ...Fig 8 Indicators and Controls BW 213 D 4 30 ...
Page 49: ...4 5 Line diagram EVIB only BTM prof Fig 41 Indicators and Controls BW 213 D 4 49 ...
Page 53: ...5 Operation Operation BW 213 D 4 53 ...
Page 92: ...Operation BW 213 D 4 92 ...
Page 93: ...6 Maintenance Maintenance BW 213 D 4 93 ...
Page 117: ...NOTICE Check the V belt tension after a running time of 30 minutes Maintenance BW 213 D 4 117 ...
Page 153: ...7 Trouble shooting Trouble shooting BW 213 D 4 153 ...
Page 161: ...8 Cab assembly before initial start up Cab assembly before initial start up BW 213 D 4 161 ...
Page 174: ...Cab assembly before initial start up BW 213 D 4 174 ...
Page 175: ...9 Disposal Disposal BW 213 D 4 175 ...
Page 177: ......
Page 178: ......