![Fayat BOMAG BW 213 D-4 Operating Instructions Manual Download Page 164](http://html1.mh-extra.com/html/fayat/bomag-bw-213-d-4/bomag-bw-213-d-4_operating-instructions-manual_3687515164.webp)
Make sure that all fastening screws, washers, spacers and
nuts to fasten the cabin are available
Check whether rear rack, foot mat, step plate and fastening
kit are available.
Fasten the lifting gear to the four lifting eyes 1
Loosen possible fastening on the transport pallet.
Slowly list the crane with a crane.
WARNING!
Danger of accident!
Do not stand or step under loads being lifted.
Fig. 201
Fig. 202
Cab assembly before initial start-up
BW 213 D-4
164
Summary of Contents for BOMAG BW 213 D-4
Page 2: ...2 ...
Page 6: ...Table of contents BW 213 D 4 6 ...
Page 7: ...1 Foreword Foreword BW 213 D 4 7 ...
Page 10: ...Fig 2 Fig 3 Foreword BW 213 D 4 10 ...
Page 11: ...2 Technical Data Technical Data BW 213 D 4 11 ...
Page 15: ...3 Safety regulations Safety regulations BW 213 D 4 15 ...
Page 29: ...4 Indicators and Controls Indicators and Controls BW 213 D 4 29 ...
Page 30: ...Fig 8 Indicators and Controls BW 213 D 4 30 ...
Page 49: ...4 5 Line diagram EVIB only BTM prof Fig 41 Indicators and Controls BW 213 D 4 49 ...
Page 53: ...5 Operation Operation BW 213 D 4 53 ...
Page 92: ...Operation BW 213 D 4 92 ...
Page 93: ...6 Maintenance Maintenance BW 213 D 4 93 ...
Page 117: ...NOTICE Check the V belt tension after a running time of 30 minutes Maintenance BW 213 D 4 117 ...
Page 153: ...7 Trouble shooting Trouble shooting BW 213 D 4 153 ...
Page 161: ...8 Cab assembly before initial start up Cab assembly before initial start up BW 213 D 4 161 ...
Page 174: ...Cab assembly before initial start up BW 213 D 4 174 ...
Page 175: ...9 Disposal Disposal BW 213 D 4 175 ...
Page 177: ......
Page 178: ......