![Fayat BOMAG BW 213 D-4 Operating Instructions Manual Download Page 60](http://html1.mh-extra.com/html/fayat/bomag-bw-213-d-4/bomag-bw-213-d-4_operating-instructions-manual_3687515060.webp)
5.5 Driving the machine
WARNING!
Danger of accident!
Wet and loose soils considerably reduce the ground
adhesion of the machine on inclinations and slopes.
Soil conditions and weather influences impair the grad-
ability of the machine.
Do not drive up and down inclinations exceeding the
maximum gradability of the machine (see technical
data).
Do not drive without wearing your seat belt.
Always give way to loaded transport vehicles!
Before starting to drive make sure that the drive range
is absolutely safe.
NOTICE!
Always keep the cabin door closed while driving with
the machine. With the door opened and the machine
fully articulated extreme oscillations of the machine
may damage the door.
The machine is equipped with a seat contact switch
(safety feature).
Only with option SN1
If the driver gets up from his seat while driving, the
signal horn is activated and the machine is slowed
down to standstill after four seconds. When the driver
sits down again the machine will continue the travel.
Before resuming operation sit down on the seat,
engage the travel lever in "0"-position (brake position),
then operate the travel lever again to the desired travel
direction.
Fig. 50
Operation
BW 213 D-4
60
Summary of Contents for BOMAG BW 213 D-4
Page 2: ...2 ...
Page 6: ...Table of contents BW 213 D 4 6 ...
Page 7: ...1 Foreword Foreword BW 213 D 4 7 ...
Page 10: ...Fig 2 Fig 3 Foreword BW 213 D 4 10 ...
Page 11: ...2 Technical Data Technical Data BW 213 D 4 11 ...
Page 15: ...3 Safety regulations Safety regulations BW 213 D 4 15 ...
Page 29: ...4 Indicators and Controls Indicators and Controls BW 213 D 4 29 ...
Page 30: ...Fig 8 Indicators and Controls BW 213 D 4 30 ...
Page 49: ...4 5 Line diagram EVIB only BTM prof Fig 41 Indicators and Controls BW 213 D 4 49 ...
Page 53: ...5 Operation Operation BW 213 D 4 53 ...
Page 92: ...Operation BW 213 D 4 92 ...
Page 93: ...6 Maintenance Maintenance BW 213 D 4 93 ...
Page 117: ...NOTICE Check the V belt tension after a running time of 30 minutes Maintenance BW 213 D 4 117 ...
Page 153: ...7 Trouble shooting Trouble shooting BW 213 D 4 153 ...
Page 161: ...8 Cab assembly before initial start up Cab assembly before initial start up BW 213 D 4 161 ...
Page 174: ...Cab assembly before initial start up BW 213 D 4 174 ...
Page 175: ...9 Disposal Disposal BW 213 D 4 175 ...
Page 177: ......
Page 178: ......